Showing posts with label custom kitchen vermont. Show all posts
Showing posts with label custom kitchen vermont. Show all posts

Sunday, July 10, 2016

a custom kitchen



well, we've been working on a kitchen for a couple months now ... we are coming down the home stretch now.  it's not been an easy one, but the clients have been great, and it's been a good exercise for the old brain, keeping track of the challenges and details ...
 just waiting for the marble and a few pieces of hardware ..
it was a long road from the drawings at the top to the photos above .. the story is below ..



the 'before' shot ... after the flood, before the rewiring and new sheetrock ..
and the removal of some of the existing structure to increase storage options ..
interesting existing challenges abound ...

for instance, this corner is 1.5" out of square in 44", floors not level; walls are not plumb either ..
leveling up the kicks ..
dealing with the heat and pipes in the corner
 cabinets and temporary counters!! memorial day weekend ..

 waiting for the appliances ..
 interesting big drawers and corner detail ,,,




two fridges and some cabinets here ..
cutting the range hood through two 4x6s was a particularly challenging operation
 lots of climbing around on top of the stove



dealing with the out of square, out of plumb corner
lights on! all set for the 4th of july!


looking like a kitchen ...
making some big doors for the pantry in the shop this past week .. 
hope to get these and the marble counters in place soon .
all for now ..

Saturday, September 29, 2012

can't keep up

busy, busy, busy here the last couple of weeks.  so busy, i haven't been able to keep up with my blogging ... it's a GOOD problem, actually.  possibly a sign that things are finally, maybe, picking up a bit.  we have had some good new sales and a definite increase in requests for quotes on new projects.   let us all knock on wood here.  where to begin?  above, is the finished upper cabinet for the kitchen we have been working on.  that project is all installed now.  click the photos to enlarge them ...
 in the works now is another pool table to go in the room with the 12' claro walnut table we shipped back in july.  must be a big room !
there were two different designs floating around and so we made a scale model of both options, and the client chose the 'long x' in the top photo.  sam will be making a welded metal base for this one ...

the only problem was, not one, but TWO different sets of slates arrived from florida broken.  definitely a setback as we had to drive to albany to purchase a third from an old friend who restores pool tables, so we could finally get underway this week.
 will has about got the rails under control ...

and jim and i have about got the slate support frame under control.  it will have metal edges to match the metal base that sam is making ....
and sam is ready to weld tomorrow
besides the pool table, sam is extremely busy in the metal shop.  he installed two railings this week, a short one at a home in rupert, and then a more substantial one at the new chamber of commerce building in manchester ... photos of those later.  he also delivered the bench above to go with the 'x' table he made a few months back. (scroll down)
and back in the woodshop, will wrapped up this cherry trestle table Thursday, and it is in the finish room getting its final polishing.
it's a new, custom version of one of our early (1980's) 'shaker' inspired designs

.and we went to a wedding and celebratory bonfire last weekend ... it was a good un.  we burned 10 years of old bookkeeping in that one ...
hot an fast
and quite beautiful ...
and will found us an almost 'new in the box' number 80 on ebay ... you can't have too many of those around when there are four people in the shop ...
and, we've also got a pair of cherry tables going that will be mostly separated, but can be put together for large parties.
we had some beautiful matched figured cherry boards from our friends at irion lumber.
and laid them out and cut them ... going to be cool ...
and i loved this one from the new yorker ... the red sox fans are back to moaning now ... there's always next year ... what else ... oh, and we stripped and refinished a nice knoll-like teak veneer desk/table from the 60's or 70's? i think ... looks like new, thanks to our friend steve holman ... spray finisher extraordinaire ...

 all for now .. gotta get those quotes out ...
wait !  it's hard to believe, but i almost forgot the next big claro walnut table.  the slab for it is now in the garage, waiting for the pool table to get out of the shop.  we'll be working on that soon ... it will have a metal base like the table we recently sent to aspen.
really, now, all for now ...

Thursday, September 27, 2012

the kitchen's in


this week and last, we moved the curly maple kitchen we have been working on from the shop to its new home.  it was trickier than it looks.  typically, templates for the counter tops are made after the counters are installed, but because of the timing, and, in particular, the long lead time on the sink, we had to make the templates and the sample sink as we started the cabinets.  click the photos to enlarge them ..


before we left the shop though, we had to finish up the plate rack cabinet.  since we actually hadn't built one of these, we made a prototype section with a tablesaw cove to keep the plates in place, (run the board on an angle over the blade raising it a little at a time). BE CAREFUL !!
then, we got to the site, which is a 1920's era large colonial that our client has been working to restore for several years.  we used the slate templates to locate the cabinets and then brought in the slate, which was cut and milled at sheldon slate in granville, just across the line in new york state ... i posted photos of their facility when we first started this project a while back.  there are more early pictures of this project at that link.
the slate was delivered and installed by tom mullan, (seated here), and his crew, sheldon's installation subcontractor, who was the epitome of professionalism, and maintained complete calm as the ineveitable little problems we encountered were overcome.
they had a slick little four wheeled dolly that enabled them, and us, to move the +/- 450 pounds pieces into place.
ta dah on the corner piece ... it fit perfectly against the wall even though there were some 'old house, out of square corners that we had dealt with when we made the templates.

next came the sink cabinet below.  we had a one dollar pool in the shop where we all guessed the weight of the 42" x 21" x 13" deep slate sink.  trevor took the loot with his guess of 425 pounds ... it said "430 pounds" on the crate.
complicating this operation was the fact that the sink was wider than the opening for the doors.  we made the corner section removable so that we could slide the sink into place and locate it (using the mdf template) and installing the doors and returns after the counter was in place.  we only had to slide the counter back once to relocate the sink about an 1/8th of an inch so that the 1/4" counter overhangs were consistent.  i was some glad when that process was finished.  there was no margin for error.
we returned a couple days later with the long, glass doored upper cabinet that will built, and that part of the installation went very smoothly.
 
all in, all done, except for the last piece, a 42" marble table that fills the space between the two counters.  that goes in tomorrow, just in time for the fundraiser party the client is hosting saturday night for the local dorset nursing association .. it should be a great party!  more pics when we are totally totally finished.
trevor put the finishing touches on it today ...
there are a lot of interesting details in this house, like the island we made back in may, (another challenging project), the soft corners on the wall openings, the owner made concrete floor tiles, and the curving steel and marble stairway...

all done; the table's in ...